In this guide · 7 practical sections

Make both suppliers price the same job
Send the same style revision, size-colour matrix, fabric brief, packaging specification and quality checks. Ask for a dated offer and the named delivery place. Record whether artwork setup, labels, inspection, cartons and sample courier are included. Separate optional items from mandatory ones before ranking offers.
Work the numbers at order level
Illustration for 600 units in one currency: offer A is USD 8.90 per unit plus USD 330 packaging and USD 780 freight to the comparison point, for USD 6,450. Offer B is USD 9.70 per unit including packaging plus USD 480 freight to that point, for USD 6,300. Their comparable subtotals are USD 10.75 and USD 10.50 per unit before destination charges. The lower factory unit price therefore gives the higher subtotal in this scenario.
Keep unquoted charges open
List destination handling, brokerage, applicable duty and tax, insurance and currency conversion separately. Ask your forwarder or customs broker to confirm them for the actual destination, shipment and product. If a cost is unknown, leave it open rather than entering zero. Check the named place and edition against the ICC rules; write payment milestones separately.
Compare cash dates and remedies
Record deposit amount, when the balance falls due, currency, inspection rights and what happens if agreed checks fail. A quote should say what can trigger a revision, such as a fabric substitution, additional colours or a different packaging specification. Reprice changes before approving them.
Decision worksheet
| Example scope | Offer A | Offer B |
|---|---|---|
| 600 garments | $5,340 | $5,820 |
| Packaging | $330 | Included |
| Freight to same point | $780 | $480 |
| Subtotal before destination charges | $6,450 / $10.75 each | $6,300 / $10.50 each |
Reference: ICC: Incoterms® 2020
Put the decision into your production brief
Research before you place an order
Questions, answered
What does a unit price exclude?
It varies with the quote. Ask for inclusions and exclusions in writing, particularly packaging, tooling, inspection, freight and destination charges.
Should I compare EXW and a delivered quote at face value?
Bring both offers to the same named comparison point, identify the additional charges and confirm where responsibility and risk transfer.