In this guide · 6 practical sections

Define the garment, then the material
Organic cotton sourcing starts with the actual material and its documentation. Separate a request for organic fibre content from a request for a certified finished-product supply chain. They are different purchasing requirements and can affect the available suppliers, minimums and process.
Composition and specification
Specify jersey, interlock, terry or fleece; composition; finished weight; usable width; surface and reverse; colour; and intended finish. A 350–360 GSM fleece request across several custom shades can become a substantial mill programme even if the garment collection is small.
Stock, custom supply and minimums
For custom knitted fabric, 200 kg per colour is a typical sourcing starting point, subject to confirmation. Every added shade can require another lot. Review actual garment consumption, cutting loss and leftovers before converting kilograms into a piece quantity.
Development and physical approval
Approve a physical swatch, shade reference and relevant wash checks. Record rib, sewing thread, decoration and labels separately. A certificate for cotton fibre alone does not validate the entire bill of materials or every statement placed on the hangtag.
Evidence, claims and repeat orders
Ask for certificate validity, entity and scope and any required transaction records for the actual order. Do not reproduce a certification logo from another website. Confirm with the relevant scheme and supply chain whether the proposed claim and artwork are authorised.
Connect the next decision.
Questions, answered
Can I approve this fabric from a photograph?
No. A photo can communicate shade and surface intention but cannot reliably establish fibre percentages, hand feel, construction or performance. Approve an identified physical swatch.
Does the garment minimum cover every fabric option?
No. The standard 300 pieces per style and colour and the mill minimum are separate. Ask for the actual material programme, colour minimum and development schedule.
Are certifications automatic for this category?
No. Evidence must match the actual material, entity, scope and order. Claims and any logo use require the relevant documentation and authorisation.