In this guide · 7 practical sections

The clock needs a defined starting point
An enquiry date, deposit date, fabric-ready date and approved PP sample date are different milestones. Ask which one starts each quoted lead time. A launch plan should list dependencies rather than adding a single factory estimate to the day you first send an email.
Material development can lead the schedule
Stock material is only useful when it is suitable and allocated. Custom knitted material typically needs a separate three-to-four-week sourcing period, with actual timing confirmed by the mill. Special shades, documentation and accessory development can add dependencies; do not assume all sourcing happens inside the sewing period.
PP sample after order confirmation
For new clients, TUGHAN TEXTILE does not offer pre-order samples. One PP sample per ordered model and colour is included after order confirmation, with shipping separate. Allow approximately 10–15 working days once the order and required materials are ready; the project schedule confirms the actual scope.
Approval is an active milestone
Combine fit, material, colour, artwork and packing comments into a controlled response. Identify what is approved and what remains pending. New design changes or a replacement fabric can require another trial. Silence or an informal acknowledgement should not be treated as bulk-release approval.
Bulk follows the approved route
Plan approximately 25–45 days after PP approval as the current bulk guide, with capacity and product complexity confirmed in writing. Cutting, sewing, specialist processes, internal quality review, finishing and packing all need space in the plan. A fixed delivery date requires a realistic critical path.
Separate factory readiness from delivery
Goods-ready, shipment collection, export clearance and customer delivery are different dates. Confirm payment release, packing data, documents and the actual transport booking. Keep a buffer for destination clearance and exceptions. A generic transit estimate is not a guaranteed arrival date.
Connect the next decision.
Questions, answered
Where should I record these decisions?
Use the brand workspace and tech pack builder, identify pending items and export a watermarked PDF for review. The file becomes a production instruction only after the parties approve its scope.
Can this guide replace the quotation or contract?
No. Confirm current product feasibility, responsibilities, price, timing and commercial terms in the written order.