In this guide · 6 practical sections

Start with one style and one colour
Use the required quantity for each style and colour, then estimate fabric demand. A 300-piece run at 250 g per garment contains about 75 kg of finished product. If a development assumption is 0.29 kg of purchased shell per piece, demand is 87 kg for that colour. Use the approved marker and actual fabric width to replace the assumption before committing. Finished garment weight includes parts that may not be cut from the shell.
A mill minimum can exceed the order
If a custom knit route requires 200 kg per colour, the illustrative 87 kg run is 113 kg below that minimum. Two colours do not automatically share one dye lot: each 300-piece colour in the example still has its own gap. Ask whether the balance is purchased, available for later releases, or avoidable with a different route. Confirm the base, finish and colour minimum with the mill.
Choose what to protect
If the target price and launch date are fixed, start from an available base and shade card. If the brand shade is fixed, reduce the number of colours or plan volume around the mill commitment. If the hand feel and weight are fixed, approve an actual finished swatch; matching the advertised GSM does not establish the same feel or recovery.
Write a repeat plan into the brief
For stock, ask whether the base is a continuing programme or a one-off lot. For custom, record the approved shade reference, finish, fabric lot and who owns any remaining metres or kilograms. Agree how long remnants can be held and what a new lot needs to pass.
Decision worksheet
| Decision | Useful evidence | What changes the answer |
|---|---|---|
| Stock | Swatch and lot availability in writing | Shade continuity and the next replenishment |
| Custom dye | Approved shade reference and written minimum | Unused fabric, approval time and lot ownership |
| Custom construction | Trial fabric after finishing | Repeatability, development expense and validation |
Put the decision into your production brief
Questions, answered
Does 600 pieces across two colours meet a 200 kg per-colour minimum?
Not necessarily. In the example, each colour uses 87 kg, so the dye-lot decision must be made separately.
Can I quote fabric using finished garment weight?
It is useful for a preliminary estimate. A production quote should use shell and secondary material consumption, actual width and the approved size ratio.